| Courses | Hours (Practical) | Hours (Theoretical) |
|---|
| Measuring lengths and angles using linear, vector and fixed measuring tools and devices | 10 | 5 |
| Planning the workpiece for execution | 10 | 5 |
| Identifying the properties and specifications of metals | 10 | 5 |
| Sawing metals with a hand saw | 10 | 5 |
| Filing metals with hand files | 30 | 5 |
| Scraping metals with hand scrapers | 15 | 5 |
| Cutting metals with a hand chisel | 10 | 5 |
| Completing holes with a reamer | 15 | 5 |
| Preparing, operating and servicing automatic drills | 15 | 5 |
| Preparing and operating the automatic reciprocating saw | 10 | 5 |
| Performing the manual external and internal toothing process | 40 | 5 |
| Inspecting and changing grease | 20 | 5 |
| Preparing, operating and servicing the parallel lathe | 40 | 5 |
| Lathing and shaping cylindrical surfaces from the outside | 40 | 5 |
| Lathing and shaping internal surfaces | 40 | 5 |
| Performing the external toothing process with one door on the lathe | 15 | 5 |
| Lathing external negatives | 10 | 5 |
| Lathing eccentric surfaces | 10 | 5 |
| Lathing external negatives | 10 | 5 |
| Performing the leveling process using the comprehensive milling | 10 | 5 |
| Preparing, operating and servicing the surface grinding machine | 50 | 5 |
| Performing the surface grinding process | 20 | 5 |
| Preparing and operating the CNC computerized lathe | 30 | 5 |
| Preparing operational and preparatory computerized lathe programs | 0 | 20 |
| Performing cutting operations using the computerized lathe | 40 | 5 |
| Downloading and checking programs | 40 | 10 |
| Preparing, operating and servicing the computerized milling | 10 | 20 |
| Preparing operational and preparatory computerized milling programs | 30 | 5 |
| Performing cutting operations using the computerized milling | 20 | 20 |
| Servicing and operating the computerized sparking machine EDM | 20 | 20 |
| Preparing operational and preparatory computerized sparking machine programs | 20 | 10 |
| Performing cutting operations using the computerized sparking machine: | 15 | 5 |
| Cleaning, arranging and storing cutting tools and measuring tools | 20 | 10 |
| Filling out maintenance forms | 25 | 20 |
| Implementing preventive maintenance programs | 40 | 15 |
| Engineering drawing (basics + projections + perspective drawing) | 0 | 30 |
| 2D AUTO CAD | 40 | 25 |
| 2D MASTER CAM | 40 | 20 |